Modernization of the railway line No 273  Wrocław Pracze - Brzezinka Średzka – Księginice section.

Gogrid POLGRID BX 30/30 has been used as reinforcement in the structure of railway track road.

 

To perform the modernization specializated equipment was necessary. AHM 800R Formation  Rehabilitation Machine is the only one in Poland and one of the five European machinery for continuous replacement of the subgrade. It’s able to replace from 400 to 600 meters of substructure without removing the rail tracks per 1 day. Machinery moving along a rail track removes waste gravel’s subgrade layer.


 

Renovation of the road near Rzepin (Poland).


 

Forest road - Gubin (Poland).  Soil stabilization.


 

Reinforcement of access roads and temporary roads to wind farm - Głubczyce

 


 

Building road S17 near Rzeszów (Poland)

 


 